22 Bishopsgate
22 Bishopsgate is the site of the former Pinnacle development.
The Pinnacle was designed in 2003 and granted planning permission in April 2006. Construction work started in 2008 but following the credit crunch, was abandoned in 2012, leaving just a seven-storey concrete core construction, referred to disparagingly as 'the Stump.'
The site, at the centre of the City of London’s cluster of tall buildings, was acquired for £300m in February 2015 by developer Lipton Rogers, funded by investors led by Axa Real Estate.
Designs by PLP Architecture showed 1.4m sq. feet of net usable space, in a 62 storey, 278 m tall tower; accommodating more floor-space than the original Pinnacle, but 10 m shorter. A planning application was submitted in July 2015 and was approved by the City of London in November 2015, backed by the then-Mayor Boris Johnson.
Sir Stuart Lipton said: “The Mayor has recognised 22 Bishopsgate as a major contribution to the on-going vitality of the City of London with a distinguished and interesting building that includes a number of new innovations designed to put the health and wellness of people first and which aims to be the first building in London to adopt the new Delos WELL building standard.”
However, the proposals were not without controversy, with the design being been criticised for over-occupying the site and for visually drawing together its neighbouring towers into a single lump.
Progress was delayed following the Brexit vote, but a decision to proceed was finally taken in October 2016, with Brookfield Multiplex expected to be appointed within weeks, and construction expected to start shortly after.
However, planning documents revealed concern about crane heights impacting on aviation safety during construction. Under the consented scheme cranes would have encroached into the 305 m (1,000 ft) safeguarding limit for London City Airport.
In December 2016 a revised planning application was submitted to the Corporation of London, reducing the building height by 23 m. The stepped apex will be cut off to create a flat-top skyscraper. The tower will now be 59 storeys, or 255 m, although the overall area will remain the same as the original plans.
22 Bishopsgate will accommodate 12,000 people and up to 100 companies. It will include a range of ‘common spaces’ where people can eat and meet as well as indoor gardens, quiet areas and interactive spaces. A free-to-access public viewing gallery will be provided at the top of the tower. It has been designed to achieve an ‘excellent’ BREEAM rating.
Practical completion was achieved in December 2020.
[edit] Related articles on Designing Buildings Wiki
- 5 Strand.
- Barking Riverside development landscape.
- Battersea Power Station.
- Crossrail 2.
- Brownfield land.
- Enterprise zones.
- Heathrow Terminal 5.
- Hertsmere House project.
- King’s Cross Station Redevelopment.
- London 2012 Olympic Stadium.
- Millennium Mills.
- Planning permission.
- Regeneration.
- Thames barrier.
- Wembley Park.
- West End Green.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.